Vehicles and journeys
All our vehicles are ULEZ compliant, so we can work on location anywhere in London's Ultra Low Emission Zone.
We aim to arrive with one vehicle per job. The rest of the team travel by public transport where they can, rather than bringing extra vans to the unit base.
To keep mileage down, we plan routes before the day and, where the diary allows, batch nearby jobs so we are not making separate runs across London for no reason. We aim to load the trailer the night before, so we are not adding extra trips on the morning of the shoot. At the unit base we switch engines off rather than leaving vehicles idling.
Where the location or schedule makes a full trailer unnecessary, we can use hot box catering to cut the number of vehicle movements. When we replace a vehicle, we will review the cleanest practical option available at the time.
We do not claim a measured carbon saving for these habits.